Skip to main content
DatumSpot
Back to Code Corner

Does my project need a building permit?

Usually yes. The IRC (§R105) and IBC (§105) require a permit before you build, alter, repair, move, or demolish most structures and their systems. Some minor work — small sheds, low fences, finishes, and like-for-like repairs — is often exempt, but the exact list is set by your local building department, so ask them first.

Source: 2021 IRC §R105; 2021 IBC §105 (permits) ·

These are model codes — the edition your jurisdiction has adopted, plus any local amendments, is what governs. Confirm with your AHJ.

need a permit? — usually yes (IRC §R105 / IBC §105) needs a permit build alter or add repair move / demolish its systems (MEP) often exempt* small shed low fence low retaining wall paint & finishes like-for-like repair * exemptions are local — confirm with your AHJ (exempt ≠ code-exempt)
Building, altering, repairing, moving, or demolishing a structure or its systems needs a permit (2021 IRC §R105 / IBC §105). Minor work is often exempt, but the thresholds are local — ask your AHJ.

As a rule, if you’re building, altering, repairing, moving, or demolishing a structure — or its electrical, plumbing, or mechanical systems — you need a permit first. Both the IRC (§R105) and the IBC (§105) require it, and the permit is what lets the building department review your plans and inspect the work.

Some minor work is exempt. The codes list typical exemptions (things like a small detached shed under a set size, low fences, retaining walls under a set height, painting and finishes, and simple like-for-like repairs) — but the exact thresholds are amended heavily by local jurisdictions, so the list that matters is your city or county’s, not the model code’s.

A few practical notes:

  • Exempt from a permit ≠ exempt from the code. The work still has to meet the applicable requirements.
  • Permits protect you — unpermitted work can cause problems at sale, insurance, or inspection, and jurisdictions can require removal or fines.
  • When in doubt, call your building department. A quick question up front is cheaper than redoing finished work.

Because the exemptions and process are local, confirm with your AHJ before you start.

Sources

Related provisions