Excavation & Aggregate Calculator

How much gravel, sand, crushed stone, or fill an area needs — cubic yards, cubic metres, and tons from length × width × depth, with a compaction allowance.

Feet or metric

Feet or metric

Often inches for a base layer

20' × 10' 4"
Excavation / fill volume (not to scale).

2.72 yd³2.08 m³

Volume to order

3.803.45 t metric

US tons

Crushed stone (#57) · 10% allowance

Order (with allowance)2.72 yd³ · 3.80 tons
Volume (neat)2.47 yd³ · 1.89 m³
Tonnage3.80 US tons · 3.45 t
Density used2,800 lb/yd³

Assumptions & notes

  • 2.72 yd³ (2.08 m³) with a 10% allowance — 2.47 yd³ neat.
  • ≈ 3.80 US tons (3.45 t) at 2,800 lb/yd³ — bulk density varies with moisture and compaction; confirm the supplier's product weight.
  • Base aggregate is delivered loose and compacts down, so the allowance covers compaction plus spillage.

How aggregate takeoff works

Volume is pure geometry: length × width × depth in cubic feet, divided by 27 for cubic yards (or ×0.0283 for cubic metres). Enter the depth in inches for a base layer — a 4" or 6" lift is typical — and it's converted automatically.

Weight comes from the material's bulk density. The presets are typical supplier figures (gravel and crushed stone ≈ 2,800 lb/yd³, sand ≈ 2,700, road base ≈ 3,000, topsoil ≈ 2,000), but density varies with moisture and gradation — enter a custom value when you have the supplier's product weight. Then add a compaction allowance, since base and fill are delivered loose and compact down once placed.

For the concrete that goes over a compacted base, use the concrete takeoff; to size a footing beneath it, the footing calculator. This is a quantity estimate — verify depths and compaction with your engineer and the adopted code.

Frequently asked questions

How do I calculate cubic yards of gravel?

Multiply length × width × depth (all in feet) for cubic feet, then divide by 27. A 20' × 10' area at 4" deep is 20 × 10 × 0.333 = 66.7 ft³ ÷ 27 ≈ 2.47 yd³. Enter the depth in inches and the tool converts it for you.

How many tons is a cubic yard of gravel?

It depends on the material and moisture, but a cubic yard of gravel or crushed stone is roughly 1.4 tons (≈2,800 lb). Sand is a little less, road base a little more. The tool multiplies your volume by the density you pick — always confirm the supplier's actual product weight before ordering by the ton.

Why add a compaction allowance?

Base aggregate is delivered loose and compacts down once it's placed and tamped, so you need to order more than the finished volume — commonly 10–25% extra depending on the material and lift. The allowance also covers spillage and uneven subgrade.

Should I order by the yard or the ton?

Suppliers sell both. The tool gives you volume (cubic yards/metres) and weight (tons/tonnes) from the same dimensions so you can order either way and check a delivered quantity against your area.